Morengo (BG), 2011
for
Municipality of Morengo
5.600 m2
Feasibility study
The New School System of Morengo represents an architecture of research, aimed at optimizing innovative and energy solutions.
The feasibility study involves a 66,000 m2 site in the northern part of the town. Within the lot are a primary school (for 250 pupils), a middle school (for 150 students), a multipurpose gym and a sports ground.
The concept and the technology used satisfy the need for a building having low carbon emissions, in compliance with the current energy saving and environmental compatibility requirements, both in the construction stage and in the building’s life cycle.