Milano, 2017
for
CMB Cooperativa Muratori e Braccianti di Carpi
approx. 29 ton of steel
Executive design
The executive design of steel structures for the CityLife Shopping District gallery was developed through the BIM methodology. In particular, in addition to exploiting all the advantages deriving from integrated design, the development of the 3D parametric model has facilitated the elaboration of the graphic part in support of the manufacturing. The 3D modeling has been accompanied by the drafting of 2D drawings of the single parts and of the unions to be welded in the production workshop.